Friday 24 April 2009

New, Relocated Bicycle parking at the Wendover Train Station


Today the new Cycle shelter was installed. I watched the work with mixed feelings. On the positive note the new parking is sheltered and it is positioned in direct line of site of the guard. My joy is shadowed by the downsizing of the available parking space. The new shelter accommodates only 10 bicycles where the one it is replacing was almost double. This morning I counted 12 pairs parked haphazardly. My hope is that in the future we will manage to get another cycle shelter; maybe on the platform. For the time being, I suppose we might also use the new motorbike shelter. I also lament the loss of the green patch opposite the station to more tarmac – I hope they will find a way to bring back some colour to the station front. Hopefully not of the machine-washable kind.





12 bikes overflow








This was the old facility: 8 double stations












Thursday 9 April 2009

MS Centre at Princess Mary Gate – planning application revised

The AVDC planning website application now presents the revised application for the MS centre at the Princess Mary Gate development (09/00532/APP). The revision requests doubling the size of the original planed centre to accommodate for a Hydrotherapy pool and provide more space. If I read the planes correctly the location has been moved around so now the parking will not be in contention with neighbours. All in all it seems to be a much better solution than the original one. I wonder what other changes to the original plan are being considered?